Masthead header

Kitchen Reno #4 – Plumbing and Layout

This morning’s priority was sealing off the old sink plumbing so I could turn the water main back on.  My luck being what it is, the laundry sink decided to break in the process, forcing an extra trip to Canadian Tire for a replacement faucet valve.  Step 1 of plumbing complete.  Step 2 (running waste pipe and cold/hot supply to the new sink location) is more difficult, and I need to think about it more before trying it 😛

After that, I finally got to lay out the first section of tile!  Looks amazing.  I don’t really like the little white things though.  I think I’ll remove them.  Garold is coming over this afternoon to start the mortaring!

November 16, 2009 - 10:53 am

Ellen Martin - Dan,
You are a brave soul to take on such a big project! I commend you.
Aunt Ellen

November 17, 2009 - 4:24 pm

shannen - And I’m a lucky wife!!!

Your email is never published or shared. Required fields are marked *

*

*

*
To prove you're a person (not a spam script), type the security word shown in the picture. Click on the picture to hear an audio file of the word.
Anti-spam image